The system replaces the traditional timber post, rail and plywood system with plastic panels fixed to scaffold poles using purpose made clips. The system is quicker to install, can be fully dismantled with no waste and can be re used several times on future schemes. Although all timber supplied in our traditional hoarding is FSC certified, dismantling results in much waste and requires redecoration to maintain a fresh appearance when re used. The new system can incorporate our surface mounted concrete ballast blocks which we pioneered seven years ago and have become a great success. Although more expensive initially, the new system is cost effective due to its durability and through our 'buy back' offer. Plastic panels can be suppied in the required corporate colours or in white which is made using 100% recycled material such as old window frames.
Nick Corrigan, Director of Willmott Dixon is enthusiastic about the system..